Load check first
A Level 2 charger needs a dedicated 240 volt circuit, usually 40 to 60 amps. Before recommending a charger or a circuit size, we add up what your panel already carries. If there is room, we install a dedicated circuit. If capacity is tight, an EV energy management system can pause or slow charging when the rest of the house is busy. If there is no room at all, the charger is planned together with a panel upgrade.
Garages, drives and older lots
Forest Hill and Rosedale homes often have attached or detached garages with long runs from the panel, while Annex and Deer Park houses may have tight side drives or laneway garages. We plan the cable route, use outdoor-rated equipment where the charger is outside, and mount it where the cable reaches the car without crossing a walkway.
When a charger stops working
If a charger keeps tripping its breaker, shows a fault or the circuit feels warm, stop charging and call us. We check the circuit, the connections and the breaker, and repair or replace what is needed so you are charging again quickly.
We install Tesla Wall Connector, ChargePoint, Grizzl-E, FLO and other major brands, hardwired for daily use, under an ESA permit and inspection.
How an EV charger install goes
- Send photos. Your panel, your parking spot and the charger model if you have one.
- Load check. We confirm capacity and choose a direct circuit, load management or an upgrade.
- Install. Circuit, cable run and charger mounted, usually in one visit when the panel is near the parking spot.
- Test. The charger’s current is set to match the breaker and tested with your car where possible.