Electrician Emergency Pro Toronto · 24/7

Knob-and-tube replacement in Midtown Toronto

Older homes in the Annex, Rosedale, Deer Park and Summerhill often still have live knob-and-tube. We find it, make anything unsafe safe right away, and replace it with grounded circuits in planned phases.

When old wiring becomes urgent

Knob-and-tube that has been spliced into newer wiring, buried in attic insulation or damaged during a renovation can overheat. Warning signs include warm switch plates, a burning smell, scorched outlets or lights that dim when something else turns on. If you notice any of these, turn off that circuit and call us.

Inspection and a clear plan

We trace what is still live from the panel, the attic and the basement, then give you a room-by-room plan. Many insurers will not cover a house with active knob-and-tube unless it is being replaced, so the plan also gives you something concrete to show your insurer.

Rewiring with minimal damage

New cable is fished through existing walls and ceilings from the basement and attic, with small, planned openings only where needed, so plaster and original trim in Rosedale and Annex houses are protected. Most families stay home during the work. Rewiring is often paired with a panel upgrade, and the job is done under an ESA permit with a final inspection.

How a rewire goes

  1. Call. Tell us what you have noticed and roughly how old the house is.
  2. Make safe. Anything overheating or damaged is isolated right away.
  3. Inspect and plan. A room-by-room scope, plus any panel work needed.
  4. Rewire and inspect. New grounded circuits in phases, then the ESA inspection and paperwork.

Knob-and-tube questions

Is knob-and-tube an emergency?

Not by itself, but signs like warm switch plates, burning smells or scorched outlets are. Turn off that circuit and call us.

How do I know if I have it?

Single wires on porcelain knobs or through porcelain tubes in the basement or attic, and two-prong outlets, are the usual signs.

How long does a rewire take?

A few leftover circuits take a day or two; a full rewire of a larger Midtown house usually takes one to two weeks.

Will my insurer accept the work?

The ESA inspection documentation from the job is what insurers typically ask for.